Σπίτι> Ιστολόγιο> Weathering steel landscape construction site

Weathering steel landscape construction site

September 14, 2023
Weathering steel is an important steel plate, it plays a huge role in our production and life, for weathering steel processing and production methods are more complex, a variety of processes are also more, so for weathering steel processing and production of easy process is what? Let's go to the small edition of Weathering steel mills to understand in detail:

1. Construction process flow: -1. Landscape wall construction process: fixed point laying - excavation foundation groove, tamping - cushion, in the C15 foundation - pouring embedded parts - installation of permeable curb, filled with white pebbles - L50*5 Angle steel, overall installation - Q345NH weathering board

metal garden screens

Garden Privacy Screens

Two, the main construction methods:
1. Fixed point pay-off: According to the plane position of the scene landscape wall, measure the reference point of pay-off. Place 100100mm grid control lines according to the grid diagram. Release the position and size of the landscape wall according to the size of the drawing.
Q345NH weather plate landscape construction steps, plans and safety matters
2. Base groove and earthwork excavation: due to the small excavation area, earthwork excavation is manual. During the excavation process, the remaining soil should be cleaned, leveled and compacted in strict accordance with the design compaction requirements.
3. Foundation pit backfilling: Before backfilling, the pipeline must be comprehensively inspected and accepted.
4. Landscape wall foundation construction: C15 concrete is poured after the foundation groove is excavated and rammed according to the requirements, and the foundation support is formed by the initial support of the wooden formwork. Strictly control the quality of raw materials, mainly the gradation of application materials, mud content and cement quality, and strictly control the slump between 10 and 12cm to ensure the quality of concrete pouring. After the concrete is poured, the embedded parts should be installed and reinforced. in During the reinforcement process, ensure that the deviation of the verticality and flatness of the embedded parts is not more than 3 mm, the deviation of the horizontal elevation is not more than 10 mm, the deviation of the embedded parts is not more than 20 mm, and the size and position of the embedded parts meet the design requirements.

corten steel artwork
Steel Sculpture5. Landscape wall construction: The landscape wall is the overall shape of the weather resistant plate, which needs to be customized by the manufacturer. The product has strict installation design requirements to ensure quality, high installation requirements, and the error is within 10mm. The deformed Angle steel should be corrected before welding, and the surface of the steel after correction should not have obvious concave or damage, the scratch depth should not be greater than 0.5 mm, and the welding should be fully welded as required Before welding, welders should check the assembly and surface cleaning quality of welds. If it does not meet the requirements, it should be repaired and then welded after repair.
flower pot holderFlower Planter

Επικοινωνήστε μαζί μας

Author:

Mr. Frank Wang

ΗΛΕΚΤΡΟΝΙΚΗ ΔΙΕΥΘΥΝΣΗ:

david@jinblai.com

Phone/WhatsApp:

+86 18903729090

δημοφιλή Προϊόντα
You may also like
Related Categories

ΗΛΕΚΤΡΟΝΙΚΗ ΔΙΕΥΘΥΝΣΗ σε αυτόν τον προμηθευτή

Θέμα:
ΗΛΕΚΤΡΟΝΙΚΗ ΔΙΕΥΘΥΝΣΗ:
μήνυμα:

Your message must be betwwen 20-8000 characters

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Αποστολή